OBM-steel plant Marcinelle, Belgium, Feb.13th. 2019.


In 1973, after good results with the conversion of the old Thomas (basic Bessemer) plant at Monceau, Forges de Thy-Marcinelle et Monceau ordered a new OBM-steel making shop (Oxygen-Bodenblasen-Maxhütte) from a consortium  VÖEST-Alpine–GHH-Sterkrade.The 17500 m² melt shop went into production in April,1976 and included a 2000 t hot metal mixer and three 150 t OBM-converters with 18 tuyeries each.

It was closed down in 2008 and will soon be gone.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>